Consider the Linear programme $$(LP)$$
Max $$4x$$ + $$6y$$
Subject to
$$\eqalign{ & \,\,\,\,\,\,\,\,\,\,\,3x + 2y \le 6 \cr & \,\,\,\,\,\,\,\,\,\,\,2x + 3y \le 6 \cr & \,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,x,y \ge 0 \cr} $$

The dual for the $$LP$$ is

A
$$\eqalign{ & {Z_{\min }} = 6u + 6v \cr & \,\,subjuect\,\,to\,\, \cr & 3u + 2v \ge 4 \cr & 2u + 3v \ge 6 \cr & u,v \ge 0 \cr} $$
B
$$\eqalign{ & {Z_{\max }} = 6u + 6v \cr & \,\,subjuect\,\,to\,\, \cr & 3u + 2v \le 4 \cr & 2u + 3v \le 6 \cr & u,v \ge 0 \cr} $$
C
$$\eqalign{ & {Z_{\max }} = 4u + 6v \cr & \,\,subjuect\,\,to\,\, \cr & 3u + 2v \ge 6 \cr & 2u + 3v \ge 6 \cr & u,v \ge 0 \cr} $$
D
$$\eqalign{ & {Z_{\max }} = 4u + 6v \cr & \,\,subjuect\,\,to\,\, \cr & 3u + 2v \le 6 \cr & 2u + 3v \le 6 \cr & u,v \ge 0 \cr} $$
2
GATE ME 2005
MCQ (Single Correct Answer)
+2
-0.6
Consider a linear programming problem with two variables and two constraints. The objective function is: Maximize $${x_1} + {x_2}.$$ The corner points of the feasible region are $$(0,0), (0,2), (2,0)$$ and $$(4/3, 4/3).$$

If an additional constraint $${x_1} + {x_2} \le 5$$ is added, the optimal solution is

A
$$\left( {{5 \over 3},{5 \over 3}} \right)$$
B
$$\left( {{4 \over 3},{4 \over 3}} \right)$$
C
$$\left( {{5 \over 2},{5 \over 2}} \right)$$
D
$$(5,0)$$
3
GATE ME 2005
MCQ (Single Correct Answer)
+2
-0.6
Consider a linear programming problem with two variables and two constraints. The objective function is: Maximize $${x_1} + {x_2}.$$ The corner points of the feasible region are $$(0,0), (0,2), (2,0)$$ and $$(4/3, 4/3).$$

Let $${y_1}$$ and $${y_2}$$ be the decision variables of the dual and $${v_1}$$ and $${v_2}$$ be the slack variables of the dual of the given linear programming problem. The optimum dual variables are

A
$${y_1}$$ and $${y_2}$$
B
$${y_1}$$ and $${v_1}$$
C
$${y_1}$$ and $${v_2}$$
D
$${v_1}$$ and $${v_2}$$
4
GATE ME 2004
MCQ (Single Correct Answer)
+2
-0.6
A company produces two types of toys: $$P$$ and $$Q.$$ Production time of $$Q$$ is twice that of $$P$$ and the company has a maximum of $$2000$$ time units per day. The supply of raw material is just sufficient to produce $$1500$$ toys (of any type) per day. Toy type $$Q$$ requires an electric switch which is available @ $$600$$ pieces per day only. The company makes a profit of Rs.$$3$$ and Rs.$$5$$ on type $$P$$ and $$Q$$ respectively. For maximization of profits, the daily production quantities of $$P$$ and $$Q$$ toys should respectively be
A
$$100, 500$$
B
$$500,1000$$
C
$$800,600$$
D
$$1000,1000$$
GATE ME Subjects
Turbo Machinery
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12