1
GATE ME 2014 Set 4
Numerical
+2
-0
At a work station, $$5$$ jobs arrive every minute. The mean time spent on each job in the work station is $$1/8$$ minute. The mean steady state number of jobs in the system is __________
Your input ____
2
GATE ME 2014 Set 1
MCQ (Single Correct Answer)
+2
-0.6
Jobs arrive at a facility at an average rate of $$5$$ in an $$8$$ hour shift. The arrival of the jobs follows Poisson distribution. The average service time of a job on the facility is $$40$$ minutes. The service time follows exponential distribution. Idle time (in hours) at the facility per shift will be
A
$${5 \over 7}$$
B
$${14 \over 3}$$
C
$${7 \over 5}$$
D
$${10 \over 3}$$
3
GATE ME 2004
MCQ (Single Correct Answer)
+2
-0.6
A maintenance service facility has Poisson arrival rates, negative exponential service time and operates on a ‘first come first served’ queue discipline. Breakdowns occur on an average of $$3$$ per day with a range of zero to eight. The maintenance crew can service an average of $$6$$ machines per day with a range of zero to seven. The mean waiting time for an item to be serviced would be
A
$${1 \over 6}$$ day
B
$${1 \over 3}$$ day
C
$$1$$ day
D
$$3$$ day
4
GATE ME 2002
MCQ (Single Correct Answer)
+2
-0.6
Arrivals at a telephone booth are considered to be Poisson, with an average time of $$10$$ minutes between successive arrivals. The length of a phone call is distributed exponentially with mean $$3$$ minutes. The probability that an arrival does not have to wait before service is
A
$$0.3$$
B
$$0.5$$
C
$$0.7$$
D
$$0.9$$
GATE ME Subjects
Turbo Machinery
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12