1
GATE ME 2017 Set 2
Numerical
+1
-0
The standard deviation of linear dimensions $$P$$ and $$Q$$ are $$3\mu m$$ and $$4\mu m$$, respectively. When assembled, the standard deviation (in $$\mu m$$) of the following linear dimension $$(P+Q)$$ is ___________.
Your input ____
2
GATE ME 2016 Set 3
MCQ (Single Correct Answer)
+1
-0.3
In $$PERT$$ chart, the activity time distribution is
3
GATE ME 2014
MCQ (Single Correct Answer)
+1
-0.3
A minimal spanning tree in network flow models involves
4
GATE ME 2009
MCQ (Single Correct Answer)
+1
-0.3
The expected time $$\left( {{t_e}} \right)$$ of a $$PERT$$ activity in terms of optimistic time $$\left( {{t_0}} \right)$$, pessimistic $$\left( {{t_p}} \right)$$ and most likely time $$\left( {{t_L}} \right)$$ is given by
Questions Asked from Pert and Cpm (Marks 1)
Number in Brackets after Paper Indicates No. of Questions
GATE ME Subjects
Engineering Mechanics
Strength of Materials
Theory of Machines
Engineering Mathematics
Machine Design
Fluid Mechanics
Turbo Machinery
Heat Transfer
Thermodynamics
Production Engineering
Industrial Engineering
General Aptitude