A project with the following data is to be implemented: GATE ME 1995 Industrial Engineering - Pert and Cpm Question 6 English

(a) What is the minimum duration of the project?
(b) Draw a Gantt chart for the early schedule
(c) Determine the peak requirement of money and the day on which it occurs in above schedule.

2
GATE ME 1993
Subjective
+5
-0
For a small project with five jobs, the following data is given GATE ME 1993 Industrial Engineering - Pert and Cpm Question 7 English
(i) Draw the project network in activity on arc mode
(ii) Under $$PERT$$ assumptions, determine the distribution of project duration.