The product structure diagram shows the number of different components required at each level to produce one unit of the final product P. If there are 50 units of on hand inventory of component A, the number of additional units of component A needed to produce 10 units of product P is _________ (in integer).
Your input ____
2
GATE ME 2015 Set 2
Numerical
+2
-0
A manufacturer has the following data regarding a product:
Fixed cost per month $$=$$ Rs. $$50,000$$
Variable cost per unit $$=$$ Rs. $$200$$
Selling price per unit $$=$$ Rs. $$300$$
Production capacity $$=$$ $$1500$$ units per month
Fixed cost per month $$=$$ Rs. $$50,000$$
Variable cost per unit $$=$$ Rs. $$200$$
Selling price per unit $$=$$ Rs. $$300$$
Production capacity $$=$$ $$1500$$ units per month
If the production is carried out at $$80\% $$ of the rated capacity, then the monthly profit (in Rs.) is ______________
Your input ____
3
GATE ME 2007
MCQ (Single Correct Answer)
+2
-0.6
Capacities of production of an item over $$3$$ consecutive months in regular time are $$100,$$ $$100$$ and $$80$$ and in overtime are $$20,$$ $$20$$ and $$40.$$ The demands over those $$3$$ months are $$90,$$ $$130$$ and $$110.$$ The cost of production in regular time and overtime are respectively Rs. $$20$$ per item and Rs. $$24$$ per item. Inventory carrying cost is Rs. $$2$$ per item per month. The levels of starting and final inventory are nil. Backorder is not permitted. For minimum cost of plan, the level of planned production in overtime in the third month is
4
GATE ME 1995
Subjective
+2
-0
Questions Asked from Production Planning and Control (Marks 2)
Number in Brackets after Paper Indicates No. of Questions
GATE ME Subjects
Engineering Mechanics
Machine Design
Strength of Materials
Heat Transfer
Production Engineering
Industrial Engineering
Turbo Machinery
Theory of Machines
Engineering Mathematics
Fluid Mechanics
Thermodynamics
General Aptitude