1
GATE ME 2003
MCQ (Single Correct Answer)
+2
-0.6
Match the following GATE ME 2003 Production Engineering - Welding Process Question 26 English
A
$$P - 2,\,\,Q - 5,\,\,R - 1,\,\,S - 3$$
B
$$P - 6,\,\,Q - 3,\,\,R - 4,\,\,S - 4$$
C
$$P - 4,\,\,Q - 1,\,\,R - 6,\,\,S - 2$$
D
$$P - 5,\,\,Q - 4,\,\,R - 2,\,\,S - 6$$
2
GATE ME 2001
MCQ (Single Correct Answer)
+2
-0.6
resistance spot welding is performed on two plates of $$1.5$$ $$mm$$ thickness with $$6$$ $$mm$$ diameter electrode, using $$15000$$ $$A$$ current for a time duration of $$0.25sec$$. assuming the interface resistance to be $$0.0001\Omega ,$$ the heat generated to form the weld is
A
$$5625$$ $$W$$-$$sec$$
B
$$8437$$ $$W$$-$$sec$$
C
$$22500$$ $$W$$-$$sec$$
D
$$33750$$ $$W$$-$$sec$$
3
GATE ME 1996
Subjective
+2
-0
GATE ME 1996 Production Engineering - Welding Process Question 28 English
4
GATE ME 1991
Subjective
+2
-0
GATE ME 1991 Production Engineering - Welding Process Question 29 English
GATE ME Subjects
Turbo Machinery
EXAM MAP
Joint Entrance Examination
JEE MainJEE AdvancedWB JEEBITSAT
Medical
NEET
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN