1
GATE ME 2006
MCQ (Single Correct Answer)
+2
-0.6
In arc welding process, the voltage and current are $$25V$$ and $$300A$$ respectively. The arc heat transfer efficiency is $$0.85$$ and welding speed is $$8$$ $$mm/sec$$. The net heat input (in $$J/mm$$) is
A
$$64$$
B
$$797$$
C
$$1103$$
D
$$79700$$
2
GATE ME 2005
MCQ (Single Correct Answer)
+2
-0.6
Spot welding of two $$1$$ $$mm$$ thick sheets of steel (density $$ = 8000kg/{m^3}$$ ) is carried out successfully by passing a certain amount of current for $$0.1$$ second through the electrodes. The resultant weld nugget formed is $$5$$ $$mm$$ in diameter and $$1.5$$ $$mm$$ thick. If the latent heat of fusion of steel is $$1400$$ $$kJ/kg$$ and the effective resistance in the welding operation is $$200\mu \Omega ,$$ the current passing through the electrodes is approximately
A
$$1480$$ $$A$$
B
$$3300$$ $$A$$
C
$$4060$$ $$A$$
D
$$9400$$ $$A$$
3
GATE ME 2004
MCQ (Single Correct Answer)
+2
-0.6
Two 1 mm thick steel sheets are to be spot welded at a current of $$5000$$ $$A.$$ Assuming effective resistance to be $$200$$ micro-ohms and current flow time of $$0.2$$ second, heat generated during the process will be
A
$$0.2$$ Joule
B
$$1$$ Joule
C
$$5$$ Joule
D
$$1000$$ Joules
4
GATE ME 2003
MCQ (Single Correct Answer)
+2
-0.6
Match the following GATE ME 2003 Production Engineering - Welding Process Question 26 English
A
$$P - 2,\,\,Q - 5,\,\,R - 1,\,\,S - 3$$
B
$$P - 6,\,\,Q - 3,\,\,R - 4,\,\,S - 4$$
C
$$P - 4,\,\,Q - 1,\,\,R - 6,\,\,S - 2$$
D
$$P - 5,\,\,Q - 4,\,\,R - 2,\,\,S - 6$$
GATE ME Subjects
Turbo Machinery
EXAM MAP
Medical
NEET
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
CBSE
Class 12