1
GATE ME 2006
MCQ (Single Correct Answer)
+2
-0.6
In arc welding process, the voltage and current are $$25V$$ and $$300A$$ respectively. The arc heat transfer efficiency is $$0.85$$ and welding speed is $$8$$ $$mm/sec$$. The net heat input (in $$J/mm$$) is
2
GATE ME 2005
MCQ (Single Correct Answer)
+2
-0.6
Spot welding of two $$1$$ $$mm$$ thick sheets of steel (density $$ = 8000kg/{m^3}$$ ) is carried out successfully by passing a certain amount of current for $$0.1$$ second through the electrodes. The resultant weld nugget formed is $$5$$ $$mm$$ in diameter and $$1.5$$ $$mm$$ thick. If the latent heat of fusion of steel is $$1400$$ $$kJ/kg$$ and the effective resistance in the welding operation is $$200\mu \Omega ,$$ the current passing through the electrodes is approximately
3
GATE ME 2004
MCQ (Single Correct Answer)
+2
-0.6
Two 1 mm thick steel sheets are to be spot welded at a current of $$5000$$ $$A.$$ Assuming effective resistance to be $$200$$ micro-ohms and current flow time of $$0.2$$ second, heat generated during the process will be
4
GATE ME 2003
MCQ (Single Correct Answer)
+2
-0.6
Match the following
GATE ME Subjects
Browse all chapters by subject
Production Engineering
General Aptitude
Fluid Mechanics
Heat Transfer
Thermodynamics
Engineering Mechanics
Machine Design
Industrial Engineering
Strength of Materials
Engineering Mathematics
Theory of Machines
Turbo Machinery