1
GATE ECE 2011
MCQ (Single Correct Answer)
+2
-0.6
The sum of n terms of the series 4 + 44 + 444 +.... is
2
GATE ECE 2011
MCQ (Single Correct Answer)
+2
-0.6
The fuel consumed by a motorcycle during a journey while traveling at various
speeds is indicated in the graph below.
The distances covered during four laps of the journey are listed in the table below
From the given data, we can conclude that the fuel consumed per kilometre was least during the lap
3
GATE ECE 2010
MCQ (Single Correct Answer)
+2
-0.6
If 137+276=435 how much is 731+672?
4
GATE ECE 2010
MCQ (Single Correct Answer)
+2
-0.6
5 skilled workers can build a wall in 20 days; 8 semi-skilled workers can build a wall
in 25 days; 10 unskilled workers can build a wall in 30 days. If a team has 2 skilled,
6 semi-skilled and 5 unskilled workers, how long will it take to build the wall?
Questions Asked from Numerical Ability (Marks 2)
Number in Brackets after Paper Indicates No. of Questions
GATE ECE Subjects
Network Theory
Control Systems
Electronic Devices and VLSI
Analog Circuits
Digital Circuits
Microprocessors
Signals and Systems
Representation of Continuous Time Signal Fourier Series Discrete Time Signal Fourier Series Fourier Transform Discrete Time Signal Z Transform Continuous Time Linear Invariant System Transmission of Signal Through Continuous Time LTI Systems Discrete Time Linear Time Invariant Systems Sampling Continuous Time Signal Laplace Transform Discrete Fourier Transform and Fast Fourier Transform Transmission of Signal Through Discrete Time Lti Systems Miscellaneous Fourier Transform
Communications
Electromagnetics
General Aptitude