1
GATE ECE 2016 Set 2
MCQ (Single Correct Answer)
+1
-0.3
S, M, E and F are working in shifts in a team to finish a project. M works with twice the efficiency of others but for half as many days as E worked. S and M have 6 hour shifts in a day, whereas E and F have 12 hours shifts. What is the ratio of contribution of M to contribution of E in the project?
A
1:1
B
1:2
C
1:4
D
2:1
2
GATE ECE 2016 Set 3
MCQ (Single Correct Answer)
+1
-0.3
The number that least fits this set: (324, 441, 97 and 64) is ________.
A
324
B
441
C
97
D
64
3
GATE ECE 2016 Set 3
MCQ (Single Correct Answer)
+1
-0.3
It takes 10 s and 15 s, respectively, for two trains traveling at different constant speeds to completely pass a telegraph post. The length of the first train is 120 m and that of the second train is 150 m. The magnitude of the difference in the speeds of the two trains (in m/s) is ____________.
A
2.0
B
10.0
C
12.0
D
22.0
4
GATE ECE 2016 Set 1
MCQ (Single Correct Answer)
+1
-0.3
In a huge pile of apples and oranges, both ripe and unripe mixed together, 15% are unripe fruits. Of the unripe fruits, 45% are apples. Of the ripe ones, 66% are oranges. If the pile contains a total of 5692000 fruits, how many of them are apples?
A
2029198
B
2467482
C
2789080
D
3577422
GATE ECE Subjects
EXAM MAP
Medical
NEET
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
CBSE
Class 12