1
GATE ECE 1997
MCQ (Single Correct Answer)
+1
-0.3
In standard TTL the 'totem pole' stage refers to
A
the multi-emitteer input stage
B
the phase splitter
C
the output buffer
D
open collector output stage
2
GATE ECE 1997
MCQ (Single Correct Answer)
+1
-0.3
A 2-bit binary multiplier can be implemented using
A
2 input AND gates only.
B
2 number of 2-input XOR gates and 6 number of 2-input AND gates.
C
Two 2-input NOR gates and one XNOR gate.
D
XOR gates and shift registers.
3
GATE ECE 1997
MCQ (Single Correct Answer)
+1
-0.3
The gate delay of an NMOS inverter is dominated by charge time rather than discharge time because
A
the driver transistor has a larger threshold voltage than the load transistor.
B
the driver transistor has larger leakage currents compared to the load transistor.
C
the load transistor has a smaller W/L ratio compared to the driver transistor
D
none of the above
4
GATE ECE 1997
MCQ (Single Correct Answer)
+1
-0.3
For the NMOS logic gate shown in figure, the logic function implemented is GATE ECE 1997 Digital Circuits - Logic Families Question 20 English
A
$$\overline {ABCDE} $$
B
$$(AB + \overline C ).(\overline {D + E} )$$
C
$$\overline {A.(B + C) + D.E} $$
D
$$(\overline {A + B} ).C + \overline D .\overline E $$