1
GATE EE 2008
MCQ (Single Correct Answer)
+2
-0.6
Three single-phase transformers are connected to form a $$3$$-phase transformer bank. The transformers are connected in the following manner.
The transformer connection will be represented by
2
GATE EE 2007
MCQ (Single Correct Answer)
+2
-0.6
A single-phase $$50$$ $$kVA,$$ $$250$$ $$V/500V$$ two winding transformer has an efficiency of $$95\% $$ at full load, unity power factor. If it is reconfigured as a $$500V/750V$$ auto-transformer, its efficiency at its new rated load at unity power factor will be
3
GATE EE 2006
MCQ (Single Correct Answer)
+2
-0.6
A $$300$$ $$kVA$$ transformer has $$95\% $$ efficiency at full load $$0.8$$ $$pf$$ lagging and $$96\% $$ efficiency at half load, unity $$pf.$$
The iron loss $$\left( {{P_i}} \right)$$ in $$kW,$$ under full load operation are
4
GATE EE 2006
MCQ (Single Correct Answer)
+2
-0.6
Two transformers are to be operated in parallel such that they share load in proportion to their $$kVA$$ ratings. The rating of the first transformer is $$500$$ $$kVA$$ and its $$pu$$ leakage impedance is $$0.05$$ $$pu.$$ If the rating of second transformer is $$250$$ $$kVA,$$ its $$pu$$ leakage impedance is
Questions Asked from Transformers (Marks 2)
Number in Brackets after Paper Indicates No. of Questions
GATE EE 2023 (1)
GATE EE 2018 (2)
GATE EE 2017 Set 2 (1)
GATE EE 2017 Set 1 (1)
GATE EE 2016 Set 2 (2)
GATE EE 2016 Set 1 (3)
GATE EE 2015 Set 1 (2)
GATE EE 2015 Set 2 (3)
GATE EE 2014 Set 2 (1)
GATE EE 2014 Set 3 (4)
GATE EE 2014 Set 1 (1)
GATE EE 2013 (1)
GATE EE 2012 (1)
GATE EE 2010 (1)
GATE EE 2009 (6)
GATE EE 2008 (2)
GATE EE 2007 (1)
GATE EE 2006 (3)
GATE EE 2004 (3)
GATE EE 2003 (3)
GATE EE 2002 (1)
GATE EE 2001 (2)
GATE EE 2000 (1)
GATE EE 1999 (5)
GATE EE 1998 (1)
GATE EE 1997 (2)
GATE EE 1993 (1)
GATE EE Subjects
Electromagnetic Fields
Signals and Systems
Engineering Mathematics
General Aptitude
Power Electronics
Power System Analysis
Analog Electronics
Control Systems
Digital Electronics
Electrical Machines
Electric Circuits