1
GATE EE 2007
MCQ (Single Correct Answer)
+2
-0.6
A single-phase $$50$$ $$kVA,$$ $$250$$ $$V/500V$$ two winding transformer has an efficiency of $$95\% $$ at full load, unity power factor. If it is reconfigured as a $$500V/750V$$ auto-transformer, its efficiency at its new rated load at unity power factor will be
A
$$95.752\% $$
B
$$97.851\% $$
C
$$98.276\% $$
D
$$99.241\% $$
2
GATE EE 2006
MCQ (Single Correct Answer)
+2
-0.6
A $$300$$ $$kVA$$ transformer has $$95\% $$ efficiency at full load $$0.8$$ $$pf$$ lagging and $$96\% $$ efficiency at half load, unity $$pf.$$

The iron loss $$\left( {{P_i}} \right)$$ in $$kW,$$ under full load operation are

A
$${P_c} = 4.12,\,\,{P_i} = 8.51$$
B
$${P_c} = 6.59,\,\,{P_i} = 9.21$$
C
$${P_c} = 8.51,\,\,{P_i} = 4.12$$
D
$${P_c} = 12.72,\,\,{P_i} = 3.07$$
3
GATE EE 2006
MCQ (Single Correct Answer)
+2
-0.6
Two transformers are to be operated in parallel such that they share load in proportion to their $$kVA$$ ratings. The rating of the first transformer is $$500$$ $$kVA$$ and its $$pu$$ leakage impedance is $$0.05$$ $$pu.$$ If the rating of second transformer is $$250$$ $$kVA,$$ its $$pu$$ leakage impedance is
A
$$0.20$$
B
$$0.10$$
C
$$0.25$$
D
$$0.025$$
4
GATE EE 2006
MCQ (Single Correct Answer)
+2
-0.6
A $$300$$ $$kVA$$ transformer has $$95\% $$ efficiency at full load $$0.8$$ $$pf$$ lagging and $$96\% $$ efficiency at half load, unity $$pf.$$

What is the maximum efficiency (in %) at unity $$pf$$ load?

A
$$95.1$$
B
$$96.2$$
C
$$96.4$$
D
$$98.1$$
GATE EE Subjects
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12