1
GATE ME 2015 Set 3
Numerical
+2
-0
The dimensions of a cylindrical side riser (height $$=$$ diameter) for a
$$25cm \times 15cm \times 5cm$$ steel casting are to be determined. For the tabulated shape factor values given below, the diameter of the riser (in $$cm$$) is _______________ GATE ME 2015 Set 3 Production Engineering - Casting Question 16 English
Your input ____
2
GATE ME 2015 Set 3
Numerical
+2
-0
Ratio of solidification time of a cylindrical casting (height $$=$$ radius) to that of a cubic casting of side two times the height of cylindrical casting is ____________
Your input ____
3
GATE ME 2015 Set 2
Numerical
+2
-0
A cube and a sphere made of cast iron (each of volume $$1000\,\,c{m^3}$$) were cast under identical conditions. The time taken for solidifying the cube was $$4$$ $$s.$$ The solidification time (in $$s$$) for the sphere is _____________________
Your input ____
4
GATE ME 2015 Set 1
MCQ (Single Correct Answer)
+2
-0.6
The solidification time of a casting is proportional to $${\left( {{V \over A}} \right)^2},$$ Where $$V$$ is the volume of the casting and $$A$$ is the total casting surface area losing heat. Two cubes of same material and size are cast using sand casting process. The top face of one of the cubes is completely insulated. The ratio of the solidification time for the cube with top face insulated to that of the other cube is
A
$${{25} \over {36}}$$
B
$${{36} \over {25}}$$
C
$$1$$
D
$${6 \over 5}$$