1
GATE EE 1997
Subjective
+5
-0
A factory draws $$100$$ kW at $$0.7$$ p.f. lagging from a $$3$$-phase, $$11$$ kV supply. It is desired to the p.f. to $$0.95$$ lagging using series capacitors. Calculate the rating of the capacitor required.
2
GATE EE 1994
Fill in the Blanks
+5
-0
The increase in resistance due to non-uniform distribution of current in a conducto $$r$$ is known as _______effect
GATE EE Subjects
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12