1
GATE EE 1997
Subjective
+5
-0
A factory draws $$100$$ kW at $$0.7$$ p.f. lagging from a $$3$$-phase, $$11$$ kV supply. It is desired to the p.f. to $$0.95$$ lagging using series capacitors. Calculate the rating of the capacitor required.
2
GATE EE 1994
Fill in the Blanks
+5
-0
The increase in resistance due to non-uniform distribution of current in a conducto $$r$$ is known as _______effect
GATE EE Subjects
EXAM MAP
Medical
NEET
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
CBSE
Class 12