1
GATE ME 1991
Subjective
+5
-0
A $$7MW$$ hydro turbine working under a head of $$10$$ $$m$$ at a rotational speed of $$125$$ $$rpm$$ is to be designed and developed by conducting model tests in a laboratory. Maximum possible discharge to the model is $$600$$ liters per second at a constant head of $$5m.$$ Determine the minimum scale of the model and its speed if the expected efficiency of the model is $$85\% .$$
2
GATE ME 1990
Subjective
+5
-0
Identify the type of turbo machinery for the following case. Specify the reasons.
Power developed $$=430$$ $$kW;$$
Operating head $$=300$$ $$m;$$
Speed $$=600$$ $$rpm.$$
Power developed $$=430$$ $$kW;$$
Operating head $$=300$$ $$m;$$
Speed $$=600$$ $$rpm.$$
GATE ME Subjects
Browse all chapters by subject
Production Engineering
General Aptitude
Fluid Mechanics
Heat Transfer
Thermodynamics
Engineering Mechanics
Machine Design
Industrial Engineering
Strength of Materials
Engineering Mathematics
Theory of Machines
Turbo Machinery