1
GATE ME 1992
Fill in the Blanks
+1
-0
In an explosive welding process, the ..................... (maximum/minimum) velocity of impact is fixed by the velocity of sound in the ............. (flyer / target) plate material.
2
GATE ME 1992
MCQ (Single Correct Answer)
+1
-0.3
For resistance spot welding of $$1.5$$ $$mm$$ thick steel sheets, the current required is of the order
3
GATE ME 1991
MCQ (Single Correct Answer)
+1
-0.3
For gas welding a particular job using a neutral oxy-acetylene flame the acetylene consumption was $$10$$ ltrs. The oxygen consumption from the cylinder in liters will be
4
GATE ME 1990
MCQ (Single Correct Answer)
+1
-0.3
At small variations of are length at operating conditions, the manual metal are welding transformer provides nearly
Questions Asked from Welding Process (Marks 1)
Number in Brackets after Paper Indicates No. of Questions
GATE ME 2024 (1)
GATE ME 2023 (1)
GATE ME 2022 Set 1 (2)
GATE ME 2017 Set 1 (1)
GATE ME 2016 Set 1 (1)
GATE ME 2015 Set 3 (1)
GATE ME 2015 Set 1 (1)
GATE ME 2014 Set 4 (1)
GATE ME 2014 Set 1 (2)
GATE ME 2011 (1)
GATE ME 2007 (1)
GATE ME 2005 (1)
GATE ME 2003 (1)
GATE ME 2002 (2)
GATE ME 2001 (1)
GATE ME 1996 (1)
GATE ME 1994 (3)
GATE ME 1993 (1)
GATE ME 1992 (2)
GATE ME 1991 (1)
GATE ME 1990 (2)
GATE ME Subjects
Engineering Mechanics
Strength of Materials
Theory of Machines
Engineering Mathematics
Machine Design
Fluid Mechanics
Turbo Machinery
Heat Transfer
Thermodynamics
Production Engineering
Industrial Engineering
General Aptitude