1
GATE ME 1992
Fill in the Blanks
+1
-0
In an explosive welding process, the ..................... (maximum/minimum) velocity of impact is fixed by the velocity of sound in the ............. (flyer / target) plate material.
2
GATE ME 1992
MCQ (Single Correct Answer)
+1
-0.3
For resistance spot welding of $$1.5$$ $$mm$$ thick steel sheets, the current required is of the order
A
$$10$$ $$Amp$$
B
$$100$$ $$Amp$$
C
$$1000$$ $$Amp$$
D
$$10,000$$ $$Amp$$
3
GATE ME 1991
MCQ (Single Correct Answer)
+1
-0.3
For gas welding a particular job using a neutral oxy-acetylene flame the acetylene consumption was $$10$$ ltrs. The oxygen consumption from the cylinder in liters will be
A
$$5$$
B
$$10$$
C
$$15$$
D
$$20$$
4
GATE ME 1990
MCQ (Single Correct Answer)
+1
-0.3
At small variations of are length at operating conditions, the manual metal are welding transformer provides nearly
A
Constant power
B
Constant power factor
C
Constant voltage
D
Constant current
GATE ME Subjects
Turbo Machinery
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12