1
GATE ME 1992
MCQ (Single Correct Answer)
+1
-0.3
For resistance spot welding of $$1.5$$ $$mm$$ thick steel sheets, the current required is of the order
A
$$10$$ $$Amp$$
B
$$100$$ $$Amp$$
C
$$1000$$ $$Amp$$
D
$$10,000$$ $$Amp$$
2
GATE ME 1992
Fill in the Blanks
+1
-0
In an explosive welding process, the ..................... (maximum/minimum) velocity of impact is fixed by the velocity of sound in the ............. (flyer / target) plate material.
3
GATE ME 1991
MCQ (Single Correct Answer)
+1
-0.3
For gas welding a particular job using a neutral oxy-acetylene flame the acetylene consumption was $$10$$ ltrs. The oxygen consumption from the cylinder in liters will be
A
$$5$$
B
$$10$$
C
$$15$$
D
$$20$$
4
GATE ME 1990
MCQ (Single Correct Answer)
+1
-0.3
Penetration is increased by
A
Increasing welding current and welding speed
B
Increasing welding current and decreasing welding speed
C
Decreasing welding current and welding spped
D
Decreasing welding current and increasing welding speed
GATE ME Subjects
Turbo Machinery
EXAM MAP
Medical
NEET
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
CBSE
Class 12