1
GATE ME 1992
MCQ (Single Correct Answer)
+1
-0.3
For resistance spot welding of $$1.5$$ $$mm$$ thick steel sheets, the current required is of the order
2
GATE ME 1992
Fill in the Blanks
+1
-0
In an explosive welding process, the ..................... (maximum/minimum) velocity of impact is fixed by the velocity of sound in the ............. (flyer / target) plate material.
3
GATE ME 1991
MCQ (Single Correct Answer)
+1
-0.3
For gas welding a particular job using a neutral oxy-acetylene flame the acetylene consumption was $$10$$ ltrs. The oxygen consumption from the cylinder in liters will be
4
GATE ME 1990
MCQ (Single Correct Answer)
+1
-0.3
At small variations of are length at operating conditions, the manual metal are welding transformer provides nearly
GATE ME Subjects
Browse all chapters by subject
Production Engineering
General Aptitude
Fluid Mechanics
Heat Transfer
Thermodynamics
Engineering Mechanics
Machine Design
Industrial Engineering
Strength of Materials
Engineering Mathematics
Theory of Machines
Turbo Machinery