1
GATE CSE 1992
MCQ (Single Correct Answer)
+2
-0.6
Which of the following is an example of a spooled device?
2
GATE CSE 1990
Fill in the Blanks
+2
-0
The highest-response ratio next scheduling policy favours $$.......$$ jobs, but it also limits the waiting time of $$ .....$$ jobs.
3
GATE CSE 1988
Subjective
+2
-0
State an undesirable characteristic of each of the following criteria for measuring performance of an operating system:
(a) Turn around time. (b) Waiting time.
(a) Turn around time. (b) Waiting time.
Questions Asked from Process Concepts and Cpu Scheduling (Marks 2)
Number in Brackets after Paper Indicates No. of Questions
GATE CSE 2024 Set 2 (1)
GATE CSE 2022 (1)
GATE CSE 2020 (1)
GATE CSE 2019 (1)
GATE CSE 2016 Set 2 (1)
GATE CSE 2015 Set 1 (1)
GATE CSE 2015 Set 3 (1)
GATE CSE 2014 Set 3 (1)
GATE CSE 2014 Set 2 (1)
GATE CSE 2014 Set 1 (1)
GATE CSE 2012 (1)
GATE CSE 2011 (1)
GATE CSE 2009 (1)
GATE CSE 2008 (2)
GATE CSE 2007 (1)
GATE CSE 2006 (2)
GATE CSE 2005 (1)
GATE CSE 2004 (1)
GATE CSE 2003 (1)
GATE CSE 2002 (2)
GATE CSE 2001 (1)
GATE CSE 1999 (2)
GATE CSE 1998 (1)
GATE CSE 1996 (1)
GATE CSE 1995 (1)
GATE CSE 1993 (2)
GATE CSE 1992 (1)
GATE CSE 1990 (1)
GATE CSE 1988 (1)
GATE CSE Subjects
Theory of Computation
Operating Systems
Algorithms
Database Management System
Data Structures
Computer Networks
Software Engineering
Compiler Design
Web Technologies
General Aptitude
Discrete Mathematics
Programming Languages