1
GATE ME 1991
Fill in the Blanks
+2
-0
Velocity compounded steam turbine known as ___________ (Curtis / Rateau ) turbine uses the principle of converting entire __________ (pressure / velocity) energy before entering the first stage runner itself.
2
GATE ME 1990
MCQ (Single Correct Answer)
+2
-0.6
When initially dry and saturated steam flows through a nozzle, the ratio of actual discharge to calculated discharge is
3
GATE ME 1990
MCQ (Single Correct Answer)
+2
-0.6
In the Rankine cycle when super-heated steam is used:
4
GATE ME 1989
MCQ (Single Correct Answer)
+2
-0.6
A economizer in a steam generator performs the function of
GATE ME Subjects
Browse all chapters by subject
Theory of Machines
Engineering Mechanics
Production Engineering
Strength of Materials
Turbo Machinery
Engineering Mathematics
Machine Design
Heat Transfer
Industrial Engineering
Thermodynamics
General Aptitude