1
GATE EE 1998
MCQ (Single Correct Answer)
+1
-0.3
Bulk power transmission over long HVDC lines are preferred, on account of
A
low cost of HVDC treminals
B
no harmonic problems
C
minimum line power losses
D
simple protection
2
GATE EE 1994
MCQ (Single Correct Answer)
+1
-0.3
HVDC transmission is preferred to EHV __ AC because
A
HVDC terminal equipment are inexpensive
B
VAR compensation is not required in HVDC systems
C
System stability can be improved.
D
Harmonics __ problem is avoided