1
GATE ME 2004
MCQ (Single Correct Answer)
+1
-0.3
At a hydro electric power plant site, available head and flow rate are $$24.5$$ $$m$$ and $$10.1{m^3}/s$$ respectively. If the turbine to be installed is required to run at $$4.0$$ revolution per second ($$rps$$) with an overall efficiency of $$90\% $$, the suitable type of turbine for this site is _______________.
2
GATE ME 2002
MCQ (Single Correct Answer)
+1
-0.3
If there are $$'m'$$ physical quantities and $$'n'$$ fundamental dimensions in a particular process, the number of non-dimensional parameters is
3
GATE ME 1997
MCQ (Single Correct Answer)
+1
-0.3
Kaplan turbine is
4
GATE ME 1994
Fill in the Blanks
+1
-0
In terms of speed of rotation of the impeller $$N$$, discharge $$Q$$ and a change in total head $$H$$, through the machine,the Specific Speed for a pump is ________________ (fill the blank)
Questions Asked from Turbo Machinery (Marks 1)
Number in Brackets after Paper Indicates No. of Questions
GATE ME Subjects
Engineering Mechanics
Machine Design
Strength of Materials
Heat Transfer
Production Engineering
Industrial Engineering
Turbo Machinery
Theory of Machines
Engineering Mathematics
Fluid Mechanics
Thermodynamics
General Aptitude