1
GATE ME 2019 Set 1
MCQ (Single Correct Answer)
+1
-0.33
A worker noticed that the hour hand on the factory clock had moved by 225 degrees during her
stay at the factory. For how long did she stay in the factory?
2
GATE ME 2019 Set 2
MCQ (Single Correct Answer)
+1
-0.33
The product of three integers X, Y and Z is 192. Z is equal to 4 and P is equal to the average of X
and Y. What is the minimum possible value of P?
3
GATE ME 2018 Set 2
MCQ (Single Correct Answer)
+1
-0.33
The value of the expression
$${1 \over {1 + \log _u^{vw}}} + {1 \over {1 + \log _v^{wu}}} + {1 \over {1 + \log _w^{uv}}}$$ is
$${1 \over {1 + \log _u^{vw}}} + {1 \over {1 + \log _v^{wu}}} + {1 \over {1 + \log _w^{uv}}}$$ is
4
GATE ME 2018 Set 1
MCQ (Single Correct Answer)
+1
-0.33
Seven machines take 7 minutes to make 7 identical toys. At the same rate, how many
minutes would it take for 100 machines to make 100 toys?
Questions Asked from Numerical Ability (Marks 1)
Number in Brackets after Paper Indicates No. of Questions
GATE ME Subjects
Engineering Mechanics
Machine Design
Strength of Materials
Heat Transfer
Production Engineering
Industrial Engineering
Turbo Machinery
Theory of Machines
Engineering Mathematics
Fluid Mechanics
Thermodynamics
General Aptitude