1
GATE ME 2019 Set 1
MCQ (Single Correct Answer)
+1
-0.33
A worker noticed that the hour hand on the factory clock had moved by 225 degrees during her
stay at the factory. For how long did she stay in the factory?
2
GATE ME 2019 Set 2
MCQ (Single Correct Answer)
+1
-0.33
The product of three integers X, Y and Z is 192. Z is equal to 4 and P is equal to the average of X
and Y. What is the minimum possible value of P?
3
GATE ME 2018 Set 1
MCQ (Single Correct Answer)
+1
-0.33
Seven machines take 7 minutes to make 7 identical toys. At the same rate, how many
minutes would it take for 100 machines to make 100 toys?
4
GATE ME 2018 Set 1
MCQ (Single Correct Answer)
+1
-0.33
A rectangle becomes a square when its length and breadth are reduced by 10 m and 5 m,
respectively. During this process, the rectangle loses 650 m2
of area. What is the area of the
original rectangle in square meters?
GATE ME Subjects
Browse all chapters by subject
Engineering Mechanics
Strength of Materials
Theory of Machines
Engineering Mathematics
Machine Design
Fluid Mechanics
Turbo Machinery
Heat Transfer
Thermodynamics
Production Engineering
Industrial Engineering
General Aptitude