1
GATE EE 2007
MCQ (Single Correct Answer)
+2
-0.6
A three phase balanced star connected voltage source with frequency $$\omega \,\,rad/s$$ is connected to a star connected balanced load which is purely inductive. The instantaneous line currents and phase to neutral voltages are denoted by $$\left( {{i_a},{i_b},{i_c}} \right)$$ and $$\left( {{V_{an}},\,\,{V_{bn}},\,\,{V_{cn}}} \right)$$ respectively and their $$rms$$ values are denoted by $$V$$ and $$1.$$ If $$$R = \left[ {{V_{an}}\,\,{V_{bn}}\,\,{V_{cn}}} \right]\left[ {\matrix{ 0 & {{1 \over {\sqrt 3 }}} & { - {1 \over {\sqrt 3 }}} \cr { - {1 \over {\sqrt 3 }}} & 0 & {{1 \over {\sqrt 3 }}} \cr {{1 \over {\sqrt 3 }}} & { - {1 \over {\sqrt 3 }}} & 0 \cr } } \right]\left[ {\matrix{ {{i_a}} \cr {{i_b}} \cr {{i_c}} \cr } } \right],$$$
then the magnitude of $$R$$ is
A
$$3$$ $$V{\rm I}$$
B
$$V{\rm I}$$
C
$$0.7$$ $$V{\rm I}$$
D
$$0$$
2
GATE EE 2006
MCQ (Single Correct Answer)
+2
-0.6
A $$400V$$, $$50$$ $$Hz,$$ three phase balanced source supplies power to a star connected load whose rating is $$12\,\,\angle 3\,\,kVA,$$ $$0.8$$ $$pf$$ (lag). The rating $$($$in $$kVAR)$$ of the delta connected (capacitive) reactive power bank necessary to bring the $$pf$$ to unity is
A
$$28.78$$
B
$$21.60$$
C
$$16.60$$
D
$$12.47$$
3
GATE EE 2003
MCQ (Single Correct Answer)
+2
-0.6
A balanced delta connected load of $$\left( {8 + j6} \right)$$ $$\Omega $$ per phase is connected to a $$400V,$$ $$50Hz,$$ $$3-$$ phase supply lines. If the input power factor is to be improved to $$0.9$$ by connecting a bank of star connected capacitors, the required $$kV$$ $$AR$$ of the bank is
A
$$42.7$$
B
$$10.2$$
C
$$28.8$$
D
$$38.4$$
4
GATE EE 1994
Numerical
+2
-0
A set of $$3$$ equal resistors, each of value $${R_X},$$ connected in star across $$RYB$$ of given Fig. consumes the same power as the unbalanced delta-connected load shown. The value of $${R_X}$$ is _____________ $$\Omega .$$ GATE EE 1994 Electric Circuits - Three Phase Circuits Question 9 English
Your input ____
GATE EE Subjects
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12