1
GATE ECE 2013
MCQ (Single Correct Answer)
+2
-0.6
The divergence of the vector field $$\,\overrightarrow A = x\widehat a{}_x + y\widehat a{}_y + z\widehat a{}_z\,\,$$ is
A
$$0$$
B
$$1/3$$
C
$$1$$
D
$$3$$
2
GATE ECE 2013
MCQ (Single Correct Answer)
+2
-0.6
Let $$U$$ and $$V$$ be two independent zero mean Gaussian random variables of variances $${1 \over 4}$$ and $${1 \over 9}$$ respectively. The probability $$\,P\left( {3V \ge 2U} \right)\,\,$$ is
A
$$4/9$$
B
$$1/2$$
C
$$2/3$$
D
$$5/9$$
3
GATE ECE 2013
MCQ (Single Correct Answer)
+2
-0.6
Consider two identically distributed zero - mean random variables $$U$$ and $$V.$$ Let the cumulative distribution functions of $$U$$ and $$2V$$ be $$F(x)$$ and $$G(x)$$ respectively. Then for all values of $$x$$
A
$$F\left( x \right) - G\left( x \right) \le 0$$
B
$$F\left( x \right) - G\left( x \right) \ge 0$$
C
$$\left( {F\left( x \right) - G\left( x \right)} \right).x \le 0$$
D
$$\left( {F\left( x \right) - G\left( x \right)} \right).x \ge 0$$
4
GATE ECE 2013
MCQ (Single Correct Answer)
+1
-0.3
For 8085 microprocessor, the following program is executed. GATE ECE 2013 Microprocessors - Instruction Set and Programming with 8085 Question 25 English At the end of program, accumulator contains
A
17 H
B
20 H
C
23 H
D
05 H
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12