1
GATE CSE 2012
MCQ (Single Correct Answer)
+2
-0.6
Consider an instance of TCP’s Additive Increase Multiplicative Decrease (AIMD) algorithm where the window size at the start of the slow start phase is 2 MSS and the threshold at the start of the first transmission is 8 MSS. Assume that a timeout occurs during the fifth transmission. Find the congestion window size at the end of the tenth transmission.
A
8 MSS
B
14 MSS
C
7 MSS
D
12 MSS
2
GATE CSE 2009
MCQ (Single Correct Answer)
+2
-0.6
While opening a TCP connection, the initial sequence number is to be derived using a time-of-day (ToD) clock that keeps running even when the host is down. The low order 32 bits of the counter of the ToD clock is to be used for the initial sequence numbers. The clock counter increments once per millisecond. The maximum packet lifetime is given to be 64s.

Which one of the choices given below is closest to the minimum permissible rate at which sequence numbers used for packets of a connection can increase?

A
0.015/s
B
0.064/s
C
0.135/s
D
0.327/s
3
GATE CSE 2008
MCQ (Single Correct Answer)
+2
-0.6
A computer on a 10 Mbps network is regulated by a token bucket. The token bucket is filled at a rate of 2 Mbps. It is initially filled to capacity with 16 Megabits. What is the maximum duration for which the computer can transmit at the full 10 Mbps?
A
1.6 seconds
B
2 seconds
C
5 seconds
D
8 seconds
4
GATE CSE 2008
MCQ (Single Correct Answer)
+2
-0.6
In the slow start phase of the TCP congestion control algorithm, the size of the congestion window
A
does not increase
B
increases linearly
C
increases quadratically
D
increases exponentially
GATE CSE Subjects
Software Engineering
Web Technologies
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12