1
GATE CSE 2014 Set 1
MCQ (Single Correct Answer)
+2
-0.6
Suppose a polynomial time algorithm is discovered that correctly computes the largest clique in a
given graph. In this scenario, which one of the following represents the correct Venn diagram of the
complexity classes P, NP and NP Complete (NPC)?
2
GATE CSE 2008
MCQ (Single Correct Answer)
+2
-0.6
The subset-sum problem is defined as follows:
Given a set S of n positive integers and a positive integer W, determine whether there is a subset of S Whose elements sum to W. An algorithm Q solves this problem in O(nW) time. Which of the following statements is false?
Given a set S of n positive integers and a positive integer W, determine whether there is a subset of S Whose elements sum to W. An algorithm Q solves this problem in O(nW) time. Which of the following statements is false?
3
GATE CSE 2006
MCQ (Single Correct Answer)
+2
-0.6
Let SHAM3 be the problem of finding a Hamiltonian cycle in a graph G = (V, E) with |V| divisible by 3 and DHAM3 be the problem of determining if a Hamiltonian cycle exists in such graphs. Which one of the following is true?
4
GATE CSE 2005
MCQ (Single Correct Answer)
+2
-0.6
Consider three decision problems P1, P2 and P3. It is known that P1 is decidable and P2 is undecidable. Which one of the following is TRUE?
Questions Asked from P and NP Concepts (Marks 2)
Number in Brackets after Paper Indicates No. of Questions
GATE CSE Subjects
Theory of Computation
Operating Systems
Algorithms
Database Management System
Data Structures
Computer Networks
Software Engineering
Compiler Design
Web Technologies
General Aptitude
Discrete Mathematics