1
GATE CSE 2007
MCQ (Single Correct Answer)
+1
-0.3
Group-1 contains some $$CPU$$ scheduling algorithms and Group-2 contains some applications. Match entries in Group-1 to entries in Group-2.

Group-1
(P) Gang Scheduling
(Q) Rate Monotonic Scheduling
(R) Fair Share Scheduling

Group-2
(1) Guaranteed Scheduling
(2) Real-time Scheduling
(3) Thread Scheduling

A
$$P - 3,Q - 2,R - 1$$
B
$$P - 1,Q - 2,R - 3$$
C
$$P - 2,Q - 3,R - 1$$
D
$$P - 1,Q - 3,R - 2$$
2
GATE CSE 2006
MCQ (Single Correct Answer)
+1
-0.3
Consider three $$CPU$$-intensive process, which require $$10,20$$ and $$30$$ time units and arrive at times $$0,2$$ and $$6$$ respectively. How many context switches are needed if the operating system implements a shortest remaining time first scheduling algorithm? Do not count the context switches at time zero and at the end.
A
$$1$$
B
$$2$$
C
$$3$$
D
$$4$$
3
GATE CSE 2004
MCQ (Single Correct Answer)
+1
-0.3
Consider the following statements with respect to user-level threads and kernel-supported threads.
i) Context switch is faster with kernel- supported threads
ii) For user-level threads, a system call can block the entire process
iii) Kernel-supported threads can be scheduled independently
iv) Use-level threads are transparent to the kernel

Which of the above statements are true?

A
(ii), (iii) & (iv) only
B
(ii) & (iii) only
C
(i) & (iii) only
D
(i) & (ii) only
4
GATE CSE 2002
MCQ (Single Correct Answer)
+1
-0.3
Which of the following scheduling algorithms is non-preemptive?
A
Round Robin
B
First-In First-Out
C
Multilevel Queue Scheduling
D
Multilevel Queue Scheduling with Feedback