1
GATE ECE 2019
MCQ (Single Correct Answer)
+1
-0.33
It would take one machine 4 hours to complete a production order and another machine 2 hours to complete the same order. If both machine work simultaneously at their respective constant rates, the time taken to complete the same order is _______ hours.
A
$${4 \over 3}$$
B
$${3 \over 4}$$
C
$${2 \over 3}$$
D
$${7 \over 3}$$
2
GATE ECE 2019
MCQ (Single Correct Answer)
+1
-0.33
The strategies that the company _______ to sell its products ________ house-to-house marketing.
A
use, includes
B
uses, including
C
uses, include
D
used, includes
3
GATE ECE 2019
MCQ (Single Correct Answer)
+2
-0.67
Two design consultants, P and Q, started working from 8 AM for a client. The client budgeted a total of USD 3000 for the consultants. P stopped working when hour hand moved by 210 degrees on the clock. Q stopped working when the hour hand moved by 240 degrees. P took two tea breaks of 15 minutes each during her shift, but took no lunch break. Q took only one lunch break for 20 minutes, but no tea breaks. The market rate for consultants is USD 200 per hour and breaks are not paid. After paying the consultants, the client shall have USD ________ remaining in the budget.
A
000.00
B
300.00
C
166.67
D
433.33
4
GATE ECE 2019
MCQ (Single Correct Answer)
+1
-0.33
Five different books (P, Q, R, S, T) are to be arranged on a shelf. The books R and S are to be arranged first and second respectively from right side of the shelf. The number of different orders in which P, Q and T may be arranged is ________.
A
6
B
2
C
12
D
120