1
GATE CE 2005
MCQ (Single Correct Answer)
+1
-0.3
The partial factor of safety for concrete as per IS: 456-2000 is
2
GATE CE 2002
MCQ (Single Correct Answer)
+1
-0.3
Modulus of elasticity of M25 grade concrete in MPa is
3
GATE CE 1997
MCQ (Single Correct Answer)
+1
-0.3
The permissible tensile stress in concrete made of M 25 concrete is
4
GATE CE 1997
MCQ (Single Correct Answer)
+1
-0.3
The cylinder strength of the concrete is less than the cube strength because of
Questions Asked from Workmenship and Fundamentals (Marks 1)
Number in Brackets after Paper Indicates No. of Questions
GATE CE 2024 Set 1 (1)
GATE CE 2017 Set 2 (1)
GATE CE 2015 Set 1 (2)
GATE CE 2014 Set 2 (3)
GATE CE 2013 (1)
GATE CE 2011 (1)
GATE CE 2009 (1)
GATE CE 2008 (1)
GATE CE 2007 (1)
GATE CE 2005 (2)
GATE CE 2002 (1)
GATE CE 1997 (2)
GATE CE 1995 (1)
GATE CE 1994 (1)
GATE CE 1993 (1)
GATE CE 1991 (1)
GATE CE 1990 (2)
GATE CE Subjects
Construction Material and Management
Geomatics Engineering Or Surveying
Levelling Traversing Theodolites and Plane Table Surveying Measurement of Area, Volume and Theory of Errors and Survey Adjustment Field Astronomy and Photogrammetric Surveying Basics of GIS, GPS and Remote Sensing Angular Measurements and Compass Survey Basic Concepts Linear Measurements and Chain Survey
Engineering Mechanics
Hydrology
Transportation Engineering
Strength of Materials Or Solid Mechanics
Reinforced Cement Concrete
Steel Structures
Environmental Engineering
Engineering Mathematics
Structural Analysis
Geotechnical Engineering
Origin of Soils Definitions and Properties of Soils Classification of Soils and Clay Mineralogy Effective Stress and Permeability Seepage Analysis Compaction of Soil Compressibility and Consolidation Shear Strength of Soil Stress Distribution of Soil Retaining Wall and Earth Pressure Stability of Slopes Shallow Foundation Pile Foundation Soil Stabilization
Fluid Mechanics and Hydraulic Machines
General Aptitude