For a reconnaissance survey, it is necessary to obtain vertical aerial photographs of a terrain at an average scale of 1: 13000 using a camera. If the...
GATE CE 2022 Set 1
A line between stations P and Q laid on a slope of 1 in 5 was measured as 350 m using a 50 m tape. The tape is known to be short by 0.1 m.
The correct...
GATE CE 2014 Set 2
The survey carried out to delineate natural features, such as hills, rivers, forests and manmade
features, such as towns, villages, buildings, roads, ...
GATE CE 2008
The type of surveying in which the curvature of the earth is taken into account is
called
GATE CE 1990
Systematic errors are those errors
Marks 2
GATE CE 2024 Set 1
A map is prepared with a scale of 1:1000 and a contour interval of 1 m. If the distance between two adjacent contours on the map is 10 mm, the slope o...
GATE CE 2007
The plan of a map was photo copied to a reduced size such that a line originally
100mm, measures 90mm. The original scale of the plan was 1:1000. The ...
GATE CE 2007
The plan of a survey plotted to a scale of 10m to 1cm is reduced in such a way