Basic Concepts · Geomatics Engineering Or Surveying · GATE CE

Start Practice

Marks 1

GATE CE 2024 Set 2
For a reconnaissance survey, it is necessary to obtain vertical aerial photographs of a terrain at an average scale of 1: 13000 using a camera. If the...
GATE CE 2022 Set 1
A line between stations P and Q laid on a slope of 1 in 5 was measured as 350 m using a 50 m tape. The tape is known to be short by 0.1 m. The correct...
GATE CE 2014 Set 2
The survey carried out to delineate natural features, such as hills, rivers, forests and manmade features, such as towns, villages, buildings, roads, ...
GATE CE 2008
The type of surveying in which the curvature of the earth is taken into account is called
GATE CE 1990
Systematic errors are those errors

Marks 2

GATE CE 2024 Set 1
A map is prepared with a scale of 1:1000 and a contour interval of 1 m. If the distance between two adjacent contours on the map is 10 mm, the slope o...
GATE CE 2007
The plan of a map was photo copied to a reduced size such that a line originally 100mm, measures 90mm. The original scale of the plan was 1:1000. The ...
GATE CE 2007
The plan of a survey plotted to a scale of 10m to 1cm is reduced in such a way that a line originally 10cm long now measures 9cm. the area of the redu...
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12