1
GATE CE 2017 Set 2
Numerical
+1
-0
For a construction project. The mean and standard deviation of the completion time are 200
days and 6.1 days, respectively. Assume normal distribution and use the value of standard
normal deviate Z = 1.64 for the 95% confidence level. The maximum time required (in days)
for the completion of the project would be __________.
Your input ____