1
GATE CE 2017 Set 2
Numerical
+2
-0
A simply supported rectangular concrete beam of span $$8$$ $$m$$ has to be prestressed with a force of $$1600$$ $$kN.$$ The tendon is of parabolic profile having zero eccentricity at the supports. The beam has to carry an external uniformly distributed load of intensity $$30$$ $$kN/m.$$ Neglecting the self - weight of the beam, the maximum dip (in meters, up to two decimal places) of the tendon at the mid-span to balance the external load should be _______________
Your input ____
2
GATE CE 2015 Set 2
MCQ (Single Correct Answer)
+2
-0.6
In a pre-stressed concrete beam section shown in the figure, the net loss is $$10\% $$ and the final prestressing force applied at $$X$$ is $$750$$ $$kN.$$ The initial fiber stresses (in $$N/m{m^2}$$ ) at the top and bottom of the beam were: GATE CE 2015 Set 2 Reinforced Cement Concrete - Prestressed Concrete Question 9 English
A
$$4.166$$ and $$20.833$$
B
$$-4.166$$ and $$-20.833$$
C
$$4.166$$ and $$-20.833$$
D
$$-4.166$$ and $$20.833$$
3
GATE CE 2013
Numerical
+2
-0
A rectangular concrete beam $$250$$ $$mm$$ wide and $$600$$ $$mm$$ deep is pre-stressed by means of $$16$$ high tensile wires, each of $$7$$ $$mm$$ diameter, located at $$200$$ $$mm$$ from the bottom face of the beam at a given section. If the effective pre-stress in the wires is $$700$$ $$MPa,$$ what is the maximum sagging bending moment (in $$kN$$-$$m$$) (correct to $$1$$-decimal place) due to live load that this section of the beam can with stand without causing tensile stress at the bottom face of the beam? Neglect the effect of dead load of beam.
Your input ____
4
GATE CE 2012
MCQ (Single Correct Answer)
+2
-0.6
A concrete beam prestressed with a parabolic tendon is shown in the sketch. The eccentricity of the tendon is measured from the centroid of the cross-section. The applied prestressing force at service is $$1620$$ $$kN.$$ The uniformly distributed load of $$45$$ $$kN/m$$ includes the self-weight. The stress (in $$N/m{m^2}$$) in the bottom fibre at mid-span is GATE CE 2012 Reinforced Cement Concrete - Prestressed Concrete Question 11 English
A
tensile $$2.90$$
B
compressive $$2.90$$
C
tensile $$4.32$$
D
compressive $$4.32$$
GATE CE Subjects
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12