1
GATE ME 2006
MCQ (Single Correct Answer)
+2
-0.6
In a sand casting operation, the total liquid head is maintained constant such that it is equal to the mould height. The time taken to fill the mould with a top gate is $${t_A}.$$ If the same mould is filed with a bottom gate, then the time taken is $${t_B}.$$ Ignore the time required to fill the runner and frictional effects. Assume atmospheric pressure at the top molten metal surfaces. The relation between the $${t_A}$$ and $${t_B}$$ is
A
$${t_B} = \sqrt 2 .{t_A}$$
B
$${t_B} = 2.{t_A}$$
C
$${t_B} = {{{t_A}} \over {\sqrt 2 }}$$
D
$${t_B} = 2\sqrt 2 .{t_A}$$
2
GATE ME 2006
MCQ (Single Correct Answer)
+2
-0.6
A $$4$$ $$mm$$ thick sheet is rolled with $$300$$ $$mm$$ diameter rolls to reduce thickness without any change in its width. The friction coefficient at the work-roll interface is $$0.1.$$ The minimum possible thickness of the sheet that can be produced in a single pass is
A
$$1.0mm$$
B
$$1.5mm$$
C
$$2.5mm$$
D
$$3.7mm$$
3
GATE ME 2006
MCQ (Single Correct Answer)
+2
-0.6
In a wire drawing operation, diameter of a steel wire is reduced from $$10$$ $$mm$$ to $$8$$ $$mm.$$ the mean flow stress of the material is $$400$$ $$MPa.$$ The ideal force required for drawing ignoring friction and redundant work is:
A
$$4.48$$ $$kN$$
B
$$8.97$$ $$kN$$
C
$$20.11$$ $$kN$$
D
$$31.41$$ $$kN$$
4
GATE ME 2006
MCQ (Single Correct Answer)
+2
-0.6
In arc welding process, the voltage and current are $$25V$$ and $$300A$$ respectively. The arc heat transfer efficiency is $$0.85$$ and welding speed is $$8$$ $$mm/sec$$. The net heat input (in $$J/mm$$) is
A
$$64$$
B
$$797$$
C
$$1103$$
D
$$79700$$