1
GATE CE 2016 Set 1
MCQ (Single Correct Answer)
+1
-0.3
Type $${\rm I}{\rm I}$$ error in hypothesis testing is
A
acceptance of the null hypothesis when it is false and should be rejected
B
rejection of the null hypothesis when it is true and should be accepted
C
rejection of the null hypothesis when it is false and should be rejected
D
acceptance of the null hypothesis when it is true and should be accepted
2
GATE CE 2014 Set 2
MCQ (Single Correct Answer)
+1
-0.3
A fair (unbiased) coin was tossed four times in succession and resulted in the following outcomes; (i) Head, (ii) Head, (III) Head, (iv) Head. The probability of obtaining a ''Tail'' when the coin is tossed again is
A
$$0$$
B
$${1 \over 2}$$
C
$${4 \over 5}$$
D
$${1 \over 5}$$
3
GATE CE 2012
MCQ (Single Correct Answer)
+1
-0.3
The annual precipitation data of a city is normally distributed with mean and standard deviation as $$1000$$mm and $$200$$ mm, respectively. The probability that the annual precipitation will be more than $$1200$$ mm is
A
$$<50$$%
B
$$50$$%
C
$$75$$%
D
$$100$$%
4
GATE CE 2010
MCQ (Single Correct Answer)
+1
-0.3
Two coins are simultaneously tossed. The probability of two heads simultaneously appearing
A
$$1/8$$
B
$$1/6$$
C
$$1/4$$
D
$$1/2$$
GATE CE Subjects
Fluid Mechanics and Hydraulic Machines
EXAM MAP
Medical
NEET
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
CBSE
Class 12