GATE CE 2001
Subjective
+5
-0
The effective spans for a simple one-way slab system, with an overhang are indicated in the figure below. The specified ultimate design loads on the slab are $$6.0\,kN/{m^2}$$ and $$4.5\,kN/{m^2}$$ for dead loads and live loads respectively. Considering the possibility of live loads not occurring simultaneously on both spans, determine the maximum spacing (in $$mm$$ units) of $$8$$ $$mm$$ diameter bars required as bottom reinforcement in the span $$AB,$$ assuming an effective depth of $$125$$ $$mm.$$ Assume $$M20$$ concrete and $$Fe$$ $$415$$ steel.
Questions Asked from Slabs (Marks 5)
Number in Brackets after Paper Indicates No. of Questions
GATE CE Subjects
Construction Material and Management
Geomatics Engineering Or Surveying
Engineering Mechanics
Transportation Engineering
Strength of Materials Or Solid Mechanics
Reinforced Cement Concrete
Steel Structures
Environmental Engineering
Engineering Mathematics
Structural Analysis
Geotechnical Engineering
Fluid Mechanics and Hydraulic Machines
General Aptitude