1
GATE ME 2007
MCQ (Single Correct Answer)
+2
-0.6
Building has to be maintained at $${21^ \circ }C$$ (dry bulb) and $${14.5^ \circ }C$$ (wet bulb). The dew point temp under these conditions is $${10.17^0}C$$. The outside temp is $$ - {23^0}C$$ (dry bulb) and internal and external surface heat transfer coefficients are $$8\,\,W/{m^2}K$$ and $$23$$ $$W/{m^2}K$$ respectively. If the building wall has a thermal conductivity of $$1.2$$ $$W/mK,$$ the minimum thickness (m) of wall required to prevent condensation is
A
$$0.471$$
B
$$0.407$$
C
$$0.321$$
D
$$0.125$$
2
GATE ME 2007
MCQ (Single Correct Answer)
+2
-0.6
Consider steady one-dimensional heat flow in a plate of $$20mm$$ thickness with a uniform heat generation of $$80MW/{m^3}.$$ The left and right faces are kept at constant temperatures of $${160^0}C$$ and $${120^0}C$$ respectively. The plate has a constant thermal conductivity of $$200W/mK.$$

The minimum temp within the plate in degree $$C$$ is

A
$$160$$
B
$$165$$
C
$$175$$
D
$$250$$
3
GATE ME 2007
MCQ (Single Correct Answer)
+2
-0.6
Consider steady one-dimensional heat flow in a plate of $$20mm$$ thickness with a uniform heat generation of $$80MW/{m^3}.$$ The left and right faces are kept at constant temperatures of $${160^0}C$$ and $${120^0}C$$ respectively. The plate has a constant thermal conductivity of $$200W/mK.$$

The location of maximum temp within the plate from left face is

A
$$15mm$$
B
$$10mm$$
C
$$5mm$$
D
$$0mm$$
4
GATE ME 2007
MCQ (Single Correct Answer)
+2
-0.6
Capacities of production of an item over $$3$$ consecutive months in regular time are $$100,$$ $$100$$ and $$80$$ and in overtime are $$20,$$ $$20$$ and $$40.$$ The demands over those $$3$$ months are $$90,$$ $$130$$ and $$110.$$ The cost of production in regular time and overtime are respectively Rs. $$20$$ per item and Rs. $$24$$ per item. Inventory carrying cost is Rs. $$2$$ per item per month. The levels of starting and final inventory are nil. Backorder is not permitted. For minimum cost of plan, the level of planned production in overtime in the third month is
A
$$400$$
B
$$30$$
C
$$20$$
D
$$0$$
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering