1
GATE EE 1999
MCQ (Single Correct Answer)
+1
-0.3
Steady state stability of a power system is the ability of the power system to
A
Maintain voltage at the rated voltage level.
B
Maintain frequency exactly at 50 Hz.
C
Maintain a spinning reserve margin at all times.
D
Maintain synchronism between machines and on external tie lines.
2
GATE EE 1999
Subjective
+5
-0
Determine the magnitudes of the symmetrical components ($${{{\rm I}_{R1}},\,{{\rm I}_{R2}}\,}$$ and $${{{\rm I}_{R0}}}$$) of the currents in a three phase (RYB) three wire system, when a short circuit occurs between R and Y phase wires, the fault current being 100 A.
3
GATE EE 1999
Subjective
+5
-0
Determine the required MVA rating of the circuit breaker CB for the system shown in given figure. Consider the grid as infinite bus. Choose 6 MVA as base. Transformer 3-phase, 33/11 kV, 6 MVA, 0.01+j0.08 p.u. impedance. Load 3-phase 11 kV, 5800 kVA, 0.8 lag, j0.2 p.u. impedance. Impedance of each feeder 9+j 18 $$\Omega $$. GATE EE 1999 Power System Analysis - Symmetrical Components and Symmetrical and Unsymmetrical Faults Question 8 English
4
GATE EE 1999
MCQ (Single Correct Answer)
+1
-0.3
Three sections of a feeder are provided with circuit breakers CB1, CB2, CB3, CB4, CB5 and CB6. For a fault F as indicated in figure. GATE EE 1999 Power System Analysis - Circuit Breaker Question 6 English
A
CB5 must be set to trip after CB1 trips.
B
CB5 must be set to trip after CB3 and CB4 trips.
C
CB5 must be set to trip after CB2 trip.
D
CB5 must be set to trip before CB1, CB2, CB3 and CB4 trip.
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12