A circular settling tank is to be designed for primary treatment of sewage at a flow rate of 10 million liters/day. Assume a detention period of 2.0 hours and surface loading rate of 40000 liters/m2/day. The height (in meters) of the water column in the tank is ______________ (rounded off to 2 decimal places).
An organic waste is represented as C240O200H180N5S5.
(Atomic weights: S-32, H-1, C-12, O-16, N-14).
Assume complete conversion of S to SO2 while burning.
SO2 generated (in grams) per kg of this waste is __________ (rounded off to 1 decimal place).
For assessing the compliance with the emissions standards of incineration plants, a correction needs to be applied to the measured concentrations of air pollutants. The emission standard (based on 11% Oxygen) for HCl is 50 mg/Nm3 and the measured concentrations of HCl and Oxygen in flue gas are 42 mg/Nm3 and 13%, respectively.
Assuming 21% Oxygen in air, the CORRECT statement is: