1
GATE CE 2022 Set 1
MCQ (Single Correct Answer)
+1
-0.33

A line between stations P and Q laid on a slope of 1 in 5 was measured as 350 m using a 50 m tape. The tape is known to be short by 0.1 m.

The corrected horizontal length (in m) of the line PQ will be

A
342.52
B
349.30
C
356.20
D
350.70
2
GATE CE 2014 Set 2
MCQ (Single Correct Answer)
+1
-0.3
The survey carried out to delineate natural features, such as hills, rivers, forests and manmade features, such as towns, villages, buildings, roads, transmission lines and canals is classified as
A
engineering survey
B
geological survey
C
land survey
D
topographic survey
3
GATE CE 2008
MCQ (Single Correct Answer)
+1
-0.3
The type of surveying in which the curvature of the earth is taken into account is called
A
Geodetic surveying
B
Plane surveying
C
Preliminary surveying
D
Topographical surveying
4
GATE CE 1990
MCQ (Single Correct Answer)
+1
-0.3
Systematic errors are those errors
A
whose effects are cumulative and can be determined
B
on circumference of circumscribing circle
C
outside the great triangle
D
in the center of the circumscribing circle