1
GATE CE 2023 Set 2
MCQ (More than One Correct Answer)
+2
-0

The figure presents the time-space diagram for when the traffic on a highway is suddenly stopped for a certain time and then released. Which of the following statements are true?

GATE CE 2023 Set 2 Transportation Engineering - Traffic Engineering Question 1 English
A
Speed is higher in Region R than in Region P
B
Volume is lower in Region Q than in Region P
C
Volume is higher in Region R than in Region P
D
Density is higher in Region Q than in Region R
2
GATE CE 2023 Set 1
MCQ (Single Correct Answer)
+2
-0.66

A plot of speed-density relationship (linear) of two roads (Road A and Road B) is shown in the figure.

GATE CE 2023 Set 1 Transportation Engineering - Traffic Engineering Question 2 English

If the capacity of Road A is CA and the capacity of Road B is CB, what is $\rm \frac{ C_A}{C_B }$?

A
$\rm \frac{ k_A}{k_B }$
B
$\rm \frac{ u_A}{u_B }$
C
$\rm \frac{ k_Au_A}{k_B u_B}$
D
$\rm \frac{ k_Au_B}{k_B u_A}$
3
GATE CE 2022 Set 2
Numerical
+2
-0

Assuming that traffic on a highway obeys the Greenshields model, the speed of a shockwave between two traffic streams (P) and (Q) as shown in the schematic is __________ kmph. (in integer)

GATE CE 2022 Set 2 Transportation Engineering - Traffic Engineering Question 6 English

Your input ____
GATE CE Subjects
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12