1
GATE EE 2006
MCQ (Single Correct Answer)
+2
-0.6
For a power system the admittance and impedance matrices for the fault studies are as follows. $$$\eqalign{ & {Y_{bus}} = \left[ {\matrix{ { - j8.75} & {j1.25} & {j2.50} \cr {j1.25} & { - j6.25} & {j2.50} \cr {j2.50} & {j2.50} & { - j5.00} \cr } } \right] \cr & {Z_{bus}} = \left[ {\matrix{ {j0.16} & {j0.08} & {j0.12} \cr {j0.08} & {j0.24} & {j0.16} \cr {j0.12} & {j0.16} & {j0.34} \cr } } \right] \cr} $$$

The pre-fault voltages are $$1.0$$ $$p.u.$$ at all the buses. The system was unloaded prior to the fault. A solid $$3$$ phase fault takes place at bus $$2.$$

The post fault voltages at buses $$1$$ and $$3$$ in per unit respectively are

A
$$0.24,0.63$$
B
$$0.31, 0.76$$
C
$$0.33, 0.67$$
D
$$0.67, 0.33$$
2
GATE EE 2006
MCQ (Single Correct Answer)
+2
-0.6
The Gauss Seidel load flow method has following disadvantages. Tick the incorrect student.
A
Unreliable convergence
B
Slow convergence
C
Choice of slack bus effects convergence
D
A good initial guess for voltages is essential for convergence
3
GATE EE 2006
MCQ (Single Correct Answer)
+1
-0.3
In a biased differential relay the bias is defined as a ratio of
A
Number of turns of restraining and operating coil
B
Operating coil current and restraining coil current
C
Fault current and operating coil current
D
Fault current and restraining coil current
4
GATE EE 2006
MCQ (Single Correct Answer)
+1
-0.3
Keeping in view the cost and overall effectiveness, the following circuit breaker is best suited for capacitor bank switching
A
vacuum
B
air blast
C
SF6
D
oil
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12