Which of the following function(s) is an accurate description of the graph for the range(s) indicated? GATE CE 2018 Set 1 General Aptitude - Numerical Ability Question 42 English $$\eqalign{ & (i)\,\,y = 2x + 4\,for\, - 3 \le x \le - 1 \cr & (ii)\,y = \,|x - 1|\,for\, - 1 \le x \le 2 \cr & (iii)\,y = \,\left| {\left| x \right| - 1} \right|\,for\, - 1 \le x \le 2 \cr & (iv)\,y = 1\,for\,2 \le x \le 3 \cr} $$
A
(i), (ii) and (iii) only.
B
(i), (ii) and (iv) only.
C
(i) and (iv) only.
D
(ii) and (iv) only.
2
GATE CE 2018 Set 1
MCQ (Single Correct Answer)
+2
-0.6
The price of a wire made of a superalloy material is proportional to the square of its length. The price of 10 m length of the wire is Rs. 1600. What would be the total price (in Rs.) of two wires of lengths 4 m and 6m?
A
768
B
832
C
1440
D
1600
3
GATE CE 2018 Set 1
MCQ (Single Correct Answer)
+2
-0.6
A fruit seller sold a basket of fruits at 12.5% loss. Had he sold it for Rs. 108 more, he would have made a 10% gain. What is the loss in Rupees incurred by the fruit seller?
A
48
B
52
C
60
D
108
4
GATE CE 2018 Set 2
MCQ (Single Correct Answer)
+2
-0.6
In manufacturing industries, loss is usually taken to be proportional to the square of the deviation from a target. If the loss is Rs. 4900 for a deviation of 7 units, what would be the loss in Rupees for a deviation of 4 units from the target?
A
400
B
1200
C
1600
D
2800
GATE CE Subjects
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12