Parts P1 - P7 are machined first on a milling machine and then polished at a separate machine. Using the information in the following table, the minimum total completion time required for carrying out both the operations for all 7 parts is _______ hours.

Part

Milling (hours)

Polishing (hours)

P1

8

6

P2

3

2

P3

3

4

P4

4

6

P5

5

7

P6

6

4

P7

2

1

A
31
B
33
C
30
D
32
2
GATE ME 2022 Set 2
Numerical
+2
-0

A project consists of five activities (A, B, C, D and E). The duration of each activity follows beta distribution. The three time estimates (in weeks) of each activity and immediate predecessor(s) are listed in the table. The expected time of the project completion is ______ weeks (in integer).

Activity

Time estimates (in weeks)

Immediate predecessor(s)

Optimistic time

Most likely time

Pessimistic time

A

4

5

6

None

B

1

3

5

A

C

1

2

3

A

D

2

4

6

C

E

3

4

5

B, D

Your input ____
3
GATE ME 2022 Set 2
MCQ (Single Correct Answer)
+2
-0.66

A manufacturing unit produces two products Pl and P2. For each piece of P1 and P2, the table below provides quantities of materials M1, M2, and M3 required, and also the profit earned. The maximum quantity available per day for M1, M2 and M3 is also provided. The maximum possible profit per day is ₹ ______

M1 M2 M3 Profit per piece ( ₹)
P1 2 2 0 150
P2 3 1 2 100
Maximum quantity available per day 70 50 40

A
5000
B
4000
C
3000
D
6000
4
GATE ME 2022 Set 2
MCQ (Single Correct Answer)
+1
-0.33
Which one of the following CANNOT impart linear motion in a CNC machine?
A
Linear motor
B
Ball screw
C
Lead screw
D
Chain and sprocket
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering