1
GATE EE 2009
MCQ (Single Correct Answer)
+2
-0.6
Match the items in List-$$I$$ (Type of transmission line) with the items in List-$$II$$ (Type of distance relay preferred) and select the correct answer using the codes below the lists.

List-$$I$$
$$A.$$ Short Line
$$B.$$ Mesium Line
$$C.$$ Long Line

List-$$II$$
$$1.$$ Ohm Relay
$$2.$$ Reactance Relay
$$3.$$ Mho Relay

A
$$A = 2,\,\,B = 1,\,\,C = 3$$
B
$$A = 3,\,\,B = 2,\,\,C = 1$$
C
$$A = 1,\,\,B = 2,\,\,C = 3$$
D
$$A = 1,\,\,B = 3,\,\,C = 2$$
2
GATE EE 2009
MCQ (Single Correct Answer)
+1
-0.3
Out of the following plant categories
(i) Nuclear , (ii) Run-of-river, (iii) Pump Storage, (iv) Diesel
The base load power plants are
A
(i) and (ii)
B
(ii) and (iii)
C
(i), (ii) and (iv)
D
(i), (iii) and (iv)
3
GATE EE 2009
MCQ (Single Correct Answer)
+2
-0.6
For the $${Y_{bus}}$$ matrix of a $$4$$-bus system given in per unit, the buses having shunt elements are $$${Y_{BUS}} = j\left[ {\matrix{ { - 5} & 2 & {2.5} & 0 \cr 2 & { - 10} & {2.5} & 4 \cr {2.5} & {2.5} & { - 9} & 4 \cr 0 & 4 & 4 & { - 8} \cr } } \right]$$$
A
$$3$$ and $$4$$
B
$$2$$ and $$3$$
C
$$1$$ and $$2$$
D
$$1,2$$ and $$4$$
4
GATE EE 2009
MCQ (Single Correct Answer)
+2
-0.6
A cascade of 3 Linear Time Invariant systems is casual and unstable. From this, we conclude that
A
each system in the cascade is individually casual and unstable
B
at least one system is unstable and atleast one system is casual
C
at least one system is casual and all systems are unstable
D
the majority are unstable and the majority are casual
EXAM MAP
Medical
NEET
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
CBSE
Class 12