1
GATE ME 1998
Subjective
+5
-0
A gas filled tube has $$2$$ $$mm$$ inside diameter and $$25$$ $$cm$$ length. The gas is heated by an electrical wire of diameter $$50$$ microns ($$0.05$$ $$mm$$) located along the axis of the tube. Current and voltage drop across the heating element are $$0.5$$ amps and $$4$$ volts, respectively. If the measured wire and inside tube wall temperatures are $${175^ \circ }C$$ and $${150^ \circ }C$$ respectively, find the thermal conductivity of the gas filling the tube.
2
GATE ME 1998
MCQ (Single Correct Answer)
+2
-0.6
The temp variation under steady heat conduction across a composite slab of two materials with thermal conductivies $${K_1}$$ and $${K_2}$$ is shown in fig. then, which one of the following statements holds? GATE ME 1998 Heat Transfer - Conduction Question 33 English
A
$${K_1} > {K_2}$$
B
$${K_1} = {K_2}$$
C
$${K_1} = 0$$
D
$${K_1} < {K_2}$$
3
GATE ME 1998
Subjective
+5
-0
A job shop has $$6$$ orders to be completed by a single turning center. The processing times and due dates are as follows: GATE ME 1998 Industrial Engineering - Scheduling Question 3 English

Assume that all orders are ready for processing. Give a production schedule that minimizes the average flow time. Compare this schedule with one that minimizes tardiness (lateness).

4
GATE ME 1998
MCQ (Single Correct Answer)
+1
-0.3
Which one of the following forecasting techniques is not suited for making forecasts for planning production schedules in the short range?
A
Moving average
B
Exponential moving average
C
Regression analysis
D
Delphi