1
GATE ME 1998
MCQ (Single Correct Answer)
+1
-0.3
Heat transfer coefficients for free convection in gasses, forced convection in gases and vapors, and for boiling water lie, respectively, in the range of
A
$$5-15, 20-200$$ and $$3000-50000$$ $$W/{m^2}K$$
B
$$20-50, 200-500,$$ and $$50000-100000$$ $$W/{m^2}K$$
C
$$50-100, 500-1000$$ and $$100000-1000000$$ $$W/{m^2}K$$
D
$$20-100, 200-1000$$ and a constant $$1000000$$ $$W/{m^2}K$$
2
GATE ME 1998
Subjective
+5
-0
A gas filled tube has $$2$$ $$mm$$ inside diameter and $$25$$ $$cm$$ length. The gas is heated by an electrical wire of diameter $$50$$ microns ($$0.05$$ $$mm$$) located along the axis of the tube. Current and voltage drop across the heating element are $$0.5$$ amps and $$4$$ volts, respectively. If the measured wire and inside tube wall temperatures are $${175^ \circ }C$$ and $${150^ \circ }C$$ respectively, find the thermal conductivity of the gas filling the tube.
3
GATE ME 1998
MCQ (Single Correct Answer)
+2
-0.6
The temp variation under steady heat conduction across a composite slab of two materials with thermal conductivies $${K_1}$$ and $${K_2}$$ is shown in fig. then, which one of the following statements holds? GATE ME 1998 Heat Transfer - Conduction Question 31 English
A
$${K_1} > {K_2}$$
B
$${K_1} = {K_2}$$
C
$${K_1} = 0$$
D
$${K_1} < {K_2}$$
4
GATE ME 1998
Subjective
+5
-0
A job shop has $$6$$ orders to be completed by a single turning center. The processing times and due dates are as follows: GATE ME 1998 Industrial Engineering - Scheduling Question 3 English

Assume that all orders are ready for processing. Give a production schedule that minimizes the average flow time. Compare this schedule with one that minimizes tardiness (lateness).

EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12