1
GATE ME 1998
MCQ (Single Correct Answer)
+2
-0.6
The temp variation under steady heat conduction across a composite slab of two materials with thermal conductivies $${K_1}$$ and $${K_2}$$ is shown in fig. then, which one of the following statements holds? GATE ME 1998 Heat Transfer - Conduction Question 33 English
A
$${K_1} > {K_2}$$
B
$${K_1} = {K_2}$$
C
$${K_1} = 0$$
D
$${K_1} < {K_2}$$
2
GATE ME 1998
Subjective
+5
-0
A job shop has $$6$$ orders to be completed by a single turning center. The processing times and due dates are as follows: GATE ME 1998 Industrial Engineering - Scheduling Question 3 English

Assume that all orders are ready for processing. Give a production schedule that minimizes the average flow time. Compare this schedule with one that minimizes tardiness (lateness).

3
GATE ME 1998
MCQ (Single Correct Answer)
+1
-0.3
Which one of the following forecasting techniques is not suited for making forecasts for planning production schedules in the short range?
A
Moving average
B
Exponential moving average
C
Regression analysis
D
Delphi
4
GATE ME 1998
MCQ (Single Correct Answer)
+1
-0.3
In inventory planning, extra inventory is unnecessarily carried to the end of the planning period when using one of the following lot size decision policies:
A
Lot – for – lot production
B
Economic Order Quantity $$(EOQ)$$ lot size
C
Period Order Quantity $$(POQ)$$ lot size
D
Part Period total cost balancing