1
GATE EE 2017 Set 2
Numerical
+2
-0
A 3-phase, 2-pole, 50 Hz, synchronous generator has a rating of 250 MVA, 0.8 pf lagging. The kinetic energy of the machine at synchronous speed is 1000 MJ. The machine is running steadily at synchronous speed and delivering 60 MW power at a power angle of 10 electrical degrees. If the load is suddenly removed, assuming the acceleration is constant for 10 cycles, the value of the power angle after 5 cycles is ________ electrical degrees.
Your input ____
2
GATE EE 2017 Set 2
MCQ (Single Correct Answer)
+1
-0.3
The figure show the per-phase representation of a phase-shifting transformer connected between buses $$1$$ and $$2,$$ where $$\alpha $$ is a complex number with non-zero real and imaginary parts. GATE EE 2017 Set 2 Power System Analysis - Load Flow Studies Question 19 English
For the given circuit, $${Y_{bus}}$$ and $${Z_{bus}}$$ are bus admittance matrix and bus impedance matrix, respectively, each of size $$2\, \times \,2$$. Which one of the following statements is true?
A
Both $${Y_{bus}}$$ and $${Z_{bus}}$$ are symmetric
B
$${Y_{bus}}$$ is symmetric and $${Z_{bus}}$$ is unsymmetric
C
$${Y_{bus}}$$ is unsymmetric and $${Z_{bus}}$$ is symmetric
D
Both $${Y_{bus}}$$ and $${Z_{bus}}$$ are unsymmetric
3
GATE EE 2017 Set 2
Numerical
+1
-0
In a load flow problem solved by Newton-Raphson method with polar coordinates, the size of the Jacobian is $$\,100\,\, \times \,\,100.$$ If there are $$20$$ PV buses in addition to PQ buses and a slack bus, the total number of buses in the system is ________.
Your input ____
4
GATE EE 2017 Set 2
MCQ (Single Correct Answer)
+2
-0.6
The output y(t) of the following system is to be sampled, so as to reconstruct it from its samples uniquely. The required minimum sampling rate is GATE EE 2017 Set 2 Signals and Systems - Sampling Theorem Question 4 English
A
1000 samples/s
B
1500 samples/s
C
2000 samples/s
D
3000 samples/s