1
GATE ME 2005
MCQ (Single Correct Answer)
+2
-0.6
A $$2$$ $$mm$$ thick metal sheet is to be bent at an angle of one radian with a bend radius of $$100$$ $$mm.$$ If the stretch factor is $$0.5,$$ the bend allowance is GATE ME 2005 Production Engineering - Sheet Metal Forming Processes Question 15 English
A
$$99$$ $$mm$$
B
$$100$$ $$mm$$
C
$$101$$ $$mm$$
D
$$102$$ $$mm$$
2
GATE ME 2005
MCQ (Single Correct Answer)
+2
-0.6
A $$600$$ $$mm$$ $$ \times \,\,30\,\,mm$$ flat surface of a plate is to be finish machined on a shaper. The plate has been fixed with the $$600$$ $$mm$$ side along the tool travel direction. If the tool over-travel at each end of the plate is $$20$$ $$mm,$$ average cutting speed is $$8$$ $$m/min,$$ feed rate is $$0.3$$ $$mm/stroke$$ and the ratio of return time to cutting time of the tool is $$1:2,$$ the time required for machining will be
A
$$8$$ minutes
B
$$12$$ minutes
C
$$16$$ minutes
D
$$20$$ minutes
3
GATE ME 2005
MCQ (Single Correct Answer)
+2
-0.6
Two tools $$P$$ and $$Q$$ have signature $${5^ \circ } - {5^ \circ } - {6^ \circ } - {6^ \circ } - {8^ \circ } - {30^ \circ } - 0$$ and $${5^ \circ } - {5^ \circ } - {7^ \circ } - {7^ \circ } - {8^ \circ } - {15^ \circ } - 0$$ (both $$ASA$$) respectively. They are used to turn components under the same machining conditions. If $${h_p}$$ and $${h_Q}$$ denote the peak-to-valley height of surfaces produced by the tools $$P$$ and $$Q$$, the ratio $${h_P}/{h_Q}$$ will be
A
GATE ME 2005 Production Engineering - Metal Cutting Question 68 English Option 1
B
GATE ME 2005 Production Engineering - Metal Cutting Question 68 English Option 2
C
GATE ME 2005 Production Engineering - Metal Cutting Question 68 English Option 3
D
GATE ME 2005 Production Engineering - Metal Cutting Question 68 English Option 4
4
GATE ME 2005
MCQ (Single Correct Answer)
+2
-0.6
The figure below shows a graph, which qualitatively relates cutting speed and cost per piece produced. GATE ME 2005 Production Engineering - Metal Cutting Question 69 English

The three curves $$1,2$$ and $$3$$ respectively represent

A
Machining cost, non-productive cost, tool changing cost
B
Non-productive cost, machining cost, tool changing cost
C
Tool changing cost, machining cost, non-productive cost
D
Tool changing cost, non-productive cost, machining cost
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12