1
GATE ME 2005
MCQ (Single Correct Answer)
+2
-0.6
The figure below shows a graph, which qualitatively relates cutting speed and cost per piece produced. GATE ME 2005 Production Engineering - Metal Cutting Question 60 English

The three curves $$1,2$$ and $$3$$ respectively represent

A
Machining cost, non-productive cost, tool changing cost
B
Non-productive cost, machining cost, tool changing cost
C
Tool changing cost, machining cost, non-productive cost
D
Tool changing cost, non-productive cost, machining cost
2
GATE ME 2005
MCQ (Single Correct Answer)
+2
-0.6
Two tools $$P$$ and $$Q$$ have signature $${5^ \circ } - {5^ \circ } - {6^ \circ } - {6^ \circ } - {8^ \circ } - {30^ \circ } - 0$$ and $${5^ \circ } - {5^ \circ } - {7^ \circ } - {7^ \circ } - {8^ \circ } - {15^ \circ } - 0$$ (both $$ASA$$) respectively. They are used to turn components under the same machining conditions. If $${h_p}$$ and $${h_Q}$$ denote the peak-to-valley height of surfaces produced by the tools $$P$$ and $$Q$$, the ratio $${h_P}/{h_Q}$$ will be
A
GATE ME 2005 Production Engineering - Metal Cutting Question 59 English Option 1
B
GATE ME 2005 Production Engineering - Metal Cutting Question 59 English Option 2
C
GATE ME 2005 Production Engineering - Metal Cutting Question 59 English Option 3
D
GATE ME 2005 Production Engineering - Metal Cutting Question 59 English Option 4
3
GATE ME 2005
MCQ (Single Correct Answer)
+2
-0.6
A $$600$$ $$mm$$ $$ \times \,\,30\,\,mm$$ flat surface of a plate is to be finish machined on a shaper. The plate has been fixed with the $$600$$ $$mm$$ side along the tool travel direction. If the tool over-travel at each end of the plate is $$20$$ $$mm,$$ average cutting speed is $$8$$ $$m/min,$$ feed rate is $$0.3$$ $$mm/stroke$$ and the ratio of return time to cutting time of the tool is $$1:2,$$ the time required for machining will be
A
$$8$$ minutes
B
$$12$$ minutes
C
$$16$$ minutes
D
$$20$$ minutes
4
GATE ME 2005
MCQ (Single Correct Answer)
+2
-0.6
A $$2$$ $$mm$$ thick metal sheet is to be bent at an angle of one radian with a bend radius of $$100$$ $$mm.$$ If the stretch factor is $$0.5,$$ the bend allowance is GATE ME 2005 Production Engineering - Sheet Metal Forming Processes Question 11 English
A
$$99$$ $$mm$$
B
$$100$$ $$mm$$
C
$$101$$ $$mm$$
D
$$102$$ $$mm$$